sexta-feira, 31 de maio de 2013

Rhine River Crossing - 1978 12th Engr Bn (River Rats - Echo Hard)

Stavba pontonového mostu - Construction of Pontoon Bridge by Czech Army

1st Armored Division Bridge over the Sava River Operation Joint Endeavor

Army Careers 12B - Combat Engineer

Combat engineer regiment helps secure G8 Summit

Canadian Army combat engineers reservists train for disasters in B.C.

Engineering Corps Bridge Building Demonstration (2/2)

Engineering Corps Bridge Building Demonstration (1/2)

US Army Reserve Engineer Building An Ribbon Bridge Across River | AiirSo...

2009 Rallye Dresden Breslau LKW Prolog Wasserloch

Dresden Breslau Rally 2009 - MAN Kat 6x6 HOLZ crossing deep River

OSKOSH 10x10

Russian Trucks.mp4

Russian trucks at their best.Российские грузовики в лучшем виде.

Russian trucks at their best.Российские грузовики в лучшем виде.

The River Crossing - Long Way Round

River crossing with tanks by the norwegian army

Leopard 1 Brugleggende tank

Bridge tank MT-55A

勝田駐屯地・施設学校開設58周年記念行事 91式戦車橋展開作業

勝田駐屯地・施設学校開設58周年記念行事 91式戦車橋撤収作業

81式自走架柱橋 撤収作業 Type81 self propelled bridge (Withdrawal working)

92式浮橋 展開

92式浮橋展張

古河駐屯地祭2010   81式自走架柱橋実演

橋桁を回収する91式戦車橋 JGSDF Type 91 AVLB

1:16 Panzerschnellbrücke Biber im Einsatz

ALÜ 2010 Pioniere - Panzerschnellbrücke Leguan

2012 Pütnitz der Brückenleger

Portada Anfíbia M3 da General Dynamics será apresentada no Rio de Janeiro para militares da Escola de Aperfeiçoamento de Oficiais (ESAO) e de Comando e Estado-Maior do Exército (ECEME)

Portada Anfíbia M3 (General Dynamics)será apresentada para 
militares no dia 3 de junho no Rio de Janeiro


50th Multi-Role Bridge Company, 5th Engineer Battalion Bridging - Soldiers sling load gap crossing assets







United States and Republic of Korea Forces conduct Combined River Crossing Operation




YEONCHEON, South Korea (May 31, 2013) -- U.S. and South Korean forces practiced bridging operations during a river crossing exercise in this border town close to the Korean Demilitarized Zone, May 30.

Eighth Army Commanding General Lt. Gen. John D. Johnson was on hand as Republic of Korea Army engineers connected a floating bridge across the Imjin River, more than 35 miles north of Seoul.

Johnson walked across the bridge and thanked the troops involved in the exercise. Since assuming command in November 2010, Johnson has visited Army units across the Korean Peninsula.

The ROK Army's 6th Engineer Brigade assembled the floating bridge that was strong enough to transport the 2-9th Infantry's M1A2 Abrahams Main Battle Tanks. 

A U.S. Army combined arms battalion, the 2-9th Infantry is part of the 2nd Infantry Division's 1st Armored Brigade Combat Team.


domingo, 26 de maio de 2013

Sistema Anfíbio de Ponte e Portada M3 da General Dynamics

12º BE Cmb Bld - Sistema Anfíbio de Ponte e Portada M3 da Empresa General Dynamics em Cachoeira do Sul

Cachoeira do Sul (RS) - Uma comitiva formada por 73 Oficiais, Subtenentes e Sargentos do 12º BE Cmb Bld e da 2ª Cia E Cmb Mec assistiram, na manhã do dia 14 de abril, em Cacheira do Sul - RS, a uma demonstração da Ponte Anfíbia Flutuante M3 no Rio Jacuí. A apresentação da equipagem, de fabricação alemã, reuniu centenas de militares das Unidades de Engenharia do CMS, sob a coordenação do 3º BE Cmb. A demonstração contou com a presença do ChEM CMS, Gen Bda Marcio Velloso Guimarães, do Cmt 6ª Bda Inf Bld, Gen Bda Glaucio Lucas Alves, militares da reserva, autoridades civis e convidados.
A Ponte Anfíbia Flutuante M3 possui Classe Militar 85 para viaturas sobre lagartas e Classe Militar 132 para viaturas sobre rodas, sendo empregada pelos Exércitos da Alemanha, do Reino Unido, de Singapura e de Taiwan. Atualmente é o equipamento de ponte flutuante mais moderno em utilização no mundo. Uma ponte flutuante M3 pode ser montada em quinze minutos por vinte quatro militares. Uma portada M3 pode ser montada em três minutos por seis militares. 









Militares testam viatura anfíbia em Cachoeira do Sul para ser usada em situações de calamidade